Slope Stabilisation

(SOIL NAILING, ROCK BOLTING, SHOTCRETING / GUNITING AND INSTALLATION OF HORIZONTAL DRAIN)


  • Slope Stabilisation Works at Jalan Wangsa 7, Bukit Antarabangsa, Ampang for MPAJ
  • Development of 2 Blocks of 40 and 39 Storeys Condominium at Jalan Kiara 3 & Jalan Kiara 4, Mont’ Kiara for Messrs. Sunrise Tower Sdn Bhd
  • Pahang-Selangor Raw Water Transfer Project – Lot 1-3A : Semantan Intake, Pumping Station and Related Works
  • Electrified Double Track Project : Seremban – Gemas – Infrastructure Package III
  • Upgrading of Jalan Paka – Santong, Laluan 122, Dungun, Terengganu
  • Proposed Development of 9 Units Bungalow and 78 Units Semi-D on Lot 563 and 568, Mukim Ulu Kelang, Gombak District, Selangor Darul Ehsan
  • Bukit Pandan Bestari – Soil Nailing, Guniting and Horizontal Drains at Wall 7 and STP
  • Kesas Highway : KM47.4 East Bound – Soil Stabilisation Works
  • Sg. Selangor Water Supply Scheme Phase 3 – Soil Stabilisation Works at Gap Road and Kg. Kerinchi
  • Western Kuala Lumpur Traffic Dispersal Scheme (Package C)
  • Construction of Simpang Pulai – Lojing – Gua Musang – Kuala Berang Highway –Package 7 – Pasir Pulau Bridge to Kg. Teris (Section 7A, CH. 0 – CH. 9650)
  • Proposed Slope Rehabilitation Works at KM 72.9 SB – Alor – Sg. Petani Expressway